USB-C hub failed radiated emissions at the formal run
A pre-scan would have caught it. The fix took a ferrite and a shield redesign — the second formal run did not.
What failed, what changed, and what shipped. Each note is written from the laboratory record, not from a brochure.
A pre-scan would have caught it. The fix took a ferrite and a shield redesign — the second formal run did not.
Full-load efficiency was fine. The regulation measures at part load, and that is where the design lost its margin.
A pre-certified Wi-Fi module went into a new chassis with a different antenna position. The module grant did not cover what was shipped.
The batteries were tested. The file contained the wrong report, and the shipment sat on a dock while the mistake was found.
Scan to chat with a testing engineer directly.
Four required fields, about 30 seconds. Email optional — used only to send the route and the report.
Thanks — that is in. An engineer replies within one working day. If it is urgent, write to cert@tmc-lab.com.