Independent testing & market access support for global markets cert@tmc-lab.com +86 755 8664 2861
01 / Safety

Electrical safety testing

IEC 62368-1 and the IEC 60335 / 61010 families — the testing that decides whether a product can carry a safety mark at all.

Standards covered
  • IEC 62368-1
  • IEC 60335-1
  • IEC 61010-1
  • IEC 61558-1
  • IEC 60529 (IP)
Sample requirements

2–3 production units plus one spare, final firmware, with the power supply you intend to ship

Typical turnaround

7–10 working days from sample receipt; 48-hour pre-scan available

Scope at a glance

What this covers, and why it matters

The short version before the detail — product families, typical use, and the practical difference our scope makes.

Product families
  • IT and AV equipment
  • Power adapters and chargers
  • Household appliances
  • Lighting control gear
  • Industrial control cabinets
Typical applications
  • Safety mark applications (CB, CE/LVD, UL)
  • Design review before a formal submission
  • Investigating a single-fault failure found in the field
What you gain
  • One clause set per product construction, not a generic checklist
  • Critical components checked against the certificates actually held
  • Measurements written next to limits so engineers can act on them

Safety testing answers one question: under a single fault, does the product stay safe? Everything else in the report — creepage, clearance, temperature rise, abnormal operation — is evidence for that answer.

How we run it

We build the test plan from the product’s construction and its intended use, not from a template. A 65 W USB-C adapter and a 65 W LED driver sit under different clauses even when they look alike on the bench, and getting that wrong is how a project loses two weeks on a retest.

  • Construction review against the clause set before any sample is powered.
  • Critical components checked against the certificate the supplier actually holds — not the datasheet claim.
  • Abnormal tests run to the clause that applies, with the failure mode photographed and logged.

What the report tells you

Every non-compliance is written with its clause reference and the measured value next to the limit, so a hardware engineer can act on it without asking us what we meant. Where a fix is obvious we say so; where it is a design decision, we say that instead.

Scope is confirmed against our CNAS accreditation before we accept samples. If a clause falls outside it, you hear that on day one rather than in the report.

What you receive

  • Test report (PDF, signed)
  • Clause-by-clause results table
  • Non-compliance list with clause references
  • Photo appendix of the as-tested build

Frequently asked

Do you test prototypes or only production units?

Both, but the report states which build was tested. A prototype report is useful for design decisions and generally not accepted for a declaration of conformity.

Can you test a product that already failed elsewhere?

Yes, and it is common. Send the earlier report if you have it — it shortens the plan.

Is the report accepted in the EU and UK?

The report is evidence; the manufacturer signs the declaration of conformity. What matters is that the standard edition and the test scope match the route you are claiming.

Also available

You may also need

Not sure whether cross-border compliance and market access apply to your product?

Talk it through for ten minutes — product, target market and the current sticking point — and we will tell you whether to do it, and what to do first.

Talk to a technical advisor →

or call 0755-8664 2861